Connecting the dyno – Dynojet 250ix: Pre-Installation Guide User Manual

Page 49

Advertising
background image

P O W E R R E Q U I R E M E N T S A N D I N S T A L L A T I O N

Locations Using 50 Hz Power (Locations other than North America and Japan)

Version 3

Pre-Installation Guide for Model 200i/250i, 200iP/250iP, 250iX, and 250iPX Motorcycle Dynamometers

B-11

C

ONNECTING

THE

D

YNO

1

Turn off the main circuit breaker on the dyno. The main breaker is located in the
CPI door. Off is the down position.

2

Once you verify the voltages on the receptacle, connect the dyno to the
receptacle.

3

Connect the high pressure blowers to the dyno. For more information on
connecting the blowers, refer to your dyno installation guide.

4

Turn on the main dyno breaker.

5

Test the blowers for operation.

6

Turn on the dyno electronics and verify operation.

7

Test the control panel operations. For more information, refer to your dyno
installation guide.

Advertising