Dynojet 250iPX: Installation Guide User Manual
Page 22
Model 200iPX/250iPX Upgrade Installation Guide
C H A P T E R 1
Dyno Preparation
1-14
I
NSTALLING
THE
M
ONITOR
S
UPPORT
AND
THE
J
UNCTION
B
OX
ON
THE
L
EFT
S
IDE
1
Secure the support arm and junction box to the pit floor using the four
3/8 x 1-inch blots and four washers removed earlier.
Note: The left blower mount is secured under the support arm.
2
Remove the blank plate on the junction box and secure it in the location shown in
Figure 1-11.
3
Route the blower cables through the junction box and secure the blower
connectors to the junction box using the screws removed earlier.
4
Secure the cable track bracket to the junction box using the two 8-32 screws
removed earlier.
5
Remove the bottom left screw from the wheel clamp and secure the wheel clamp
cable track bracket to the wheel clamp.
Figure 1-11: Install the Junction Box and Monitor Support
support arm
junction box
blower mount
(under support arm)
fan connectors
blank plate