0 calibration, Calibration, Rate speed totalizer load tn/hr ft/min lb/ft tn – Rice Lake BCi Belt Scale - Calibration Guide User Manual

Page 7: Softkey, Softkey from the supervisor’s menu, The integrator will change the softkeys to

Advertising
background image

Calibration

3

3.0

Calibration

To begin calibration, press the

Supervisor Mode

softkey.

05/30/2013

08:13AM

Supervisor

Mode

Reset

Totalizer

SCALE #1

Diagnostics

Rate

Speed

Totalizer

Load

tn/hr
ft/min
lb/ft
tn

Belt Scale SW PN 154789 1.00

Figure 3-1. Supervisor Mode Softkey

3.1

Speed Sensor Calibration (Belt Sensor Calibration)

Use the following steps to calibrate the speed sensor.

1. Press the

Belt Calibration

softkey from the supervisor’s menu.

Exit=>

SCALE #1

Master

Totalizer

Integrator

Calibrati

5/30/2013

08:13AM

Admin. Passcode (numeric)

Scale Capacity (Max Rate)

Load Cell MV

Total LC Build

Rate Unit Time

Filter (s)

Filter Threshold (divisions)

Speed Unit Time

Fixed Speed

Unit of Measure

420.00

1.99900

800

hr
7.0

2

min

0.00

ft

Belt

Calibration

Time/Date

Figure 3-2. Belt Calibration Softkey

2. The integrator will change the softkeys to

Start, Finish

and

Exit

.

Exit=>

SCALE #1

Start

Finish

5/30/2013

08:15AM

Admin. Passcode (numeric)

Scale Capacity (Max Rate)

Load Cell MV

Total LC Build

Rate Unit Time

Filter (s)

Filter Threshold (divisions)

Speed Unit Time

Fixed Speed

Unit of Measure

420.00

1.99900

800

hr
7.0

2

min

0.00

ft

Figure 3-3. Start, Finish and Exit Softkeys

A reference point needs to be marked on the conveyor belt and a reference point needs to be marked on the
conveyor frame. This will give the operator a reference to count the number of revolutions the belt travels
during the speed calibration. The more revolutions in a test, the better the speed and distance accuracy.

Advertising