Installation Manual

Hygienic Weighing Module Contego®

Sartorius

EN-25

7.2

Checks with Multimeter

7.2.1

Check Zero Output Signal of Load Cell

• Unload load cell.
• Disconnect the load cell measuring outputs.
• Check whether the output voltage without load is within the limits.

Type

Zero output signal

D1, C3

0 mV ±0.02 mV/V

7.2.2

Checking the Strain Gauge Bridge of the Load Cell

• Do not exceed the test voltage.
• Check whether the values of the resistors are within the permissible limits.

Maximum test voltage

Standard industrial

28 V DC

intrinsically safe version (PR …/…E)

25 V DC

Type

Input impedance
(red core, blue core)

Output impedance
(green core, gray core)

D1

650

Ω ±6 Ω

610

Ω ±1 Ω

C3

650

Ω ±6 Ω

610

Ω ±0.5 Ω

7.2.3

Checking the Insulation Impedance of the Load Cell

• Never apply the test voltage between the cores of the load cell cable (danger of destroying the load

cell).

• Insulate the load cell cores.

Maximum test voltage

Standard industrial

100 V DC

Intrinsically safe version (PR …/…E)

500 V AC

Insulation impedance

Core - housing

>5000 M

Core - screen

>5000 M

Screen - housing

>5000 M

7.2.4

Check Insulation Impedance of Connecting Cable

• Disconnect connecting cable and load cells.
• Insulate the cores of the connecting cable.

Insulation impedance

Core - core

≥600 MΩ × km

Core - screen

≥600 MΩ × km