2.3.2

Jack-up

Procedure
• Release the locknut (2).
• Turn up the screw (1) at the hex to lift the vessel.

Caution: Don't lift the vessel by more than
6 mm!

Turn the bolt until the load cell is unloaded and
can be removed together with the upper thrust

piece.

• Insert the upper thrust piece into the new load

cell.

• Insert the load cell into the mounting kit, push

the load cell cable through the cable gland and
block it; refer to Chapter 8.1.2.

• Adjust the internal lift-off protector; refer to

Chapter 2.3.3.

2.3.3

Adjusting the Internal Lift-Off Protector

Procedure
• Release the locknut (2).
• Turn the bolt (1) of the lift-off protector at the

hex (3) fully down to the stop.

• Turn the bolt back by 1…1½ revolutions

(approx. 2 mm) to adjust the spacing.

• Re-tighten the locknut (2).