Pin 2 pin 7 ic u9 – Rice Lake Scout Pro Series Portable, Ohaus - Service Manual User Manual

Page 36

Advertising
background image

B-2

APPENDIX B FACTORY CALIBRATIONS

3.

You may need to use some kind of draft shield since the top cover has to be left off.

4.

Apply power to the balance.

5.

Start with the unit off.

6.

Press and hold both the ON/ZERO Off and the PRINT Unit buttons until the display reads

rAMP.

7.

Press and release the PRINT Unit button. The display will show Lin.

8.

Press and release the ON/ZERO Off button. The display will show -C- blinking and then

the first mass value.

9.

Place masses totaling this value on the balance and press the ON/ZERO Off button.

10. Press and release the ON/ZERO Off button. The display will show -C- blinking and then

the second mass value.

11. Place masses totaling this value on the balance and press the ON/ZERO Off button.

12. Press and release the ON/ZERO Off button. The display will show -C- blinking and then

donE followed by Lin.

B.2 FACTORY CALIBRATION (CONT.)

U9

CAL

J6

J11

LCD DISPLAY

U8

U7

J2

C4

BLK

RED

PIN 2

PIN 7

IC U9

Figure B-1. IC U9 Connections.

Advertising