Smart Power Systems SSP UPS User Manual

Page 26

Advertising
background image

23

4. INSTALLATION

4. Pull two covers toward the direction shown as below.

5. Align the mounting bracket with the screw holes on the each side of Host

and EBM and secure with the supplied screws.

6. Reinstall the Host and EBM cover.

Advertising