4. INSTALLATION

EBM and EBM integrate a rack form

3000VA

Install the 3000VA series into 19” rack as shown below

9. Turn on the UPS and connect the load.

10. After installing the UPS into rack, the load may be connected. Make

sure the load equipment is turned off, then plug all loads into the output
receptacle properly protected by a circuit breaker of fuse in accordance
with national and local electrical codes.