Smart Power Systems SSP UPS User Manual

Page 28

Advertising
background image

1500/2000VA (Optional)

2. First align the slide-rail on both
sides of rack by the screw holes,
and lock a screw in the downside
hole of both sides at the front of
the rack.

3. Lock screws in four holes on both
sides at the rear of the rack.

4. Insert UPS into the slide-rail and
lock it in the rack enclosure.

1. Compose HOST and
EBM into rack assembly.

25

Advertising