Chute up switch installation, Control function test, 1 chute up switch installation – B&C Technologies SI Series Industrial User Manual

Page 32: 13 control function test

Advertising
background image

Figure 5.8: External Chemical Supply Terminal Block Detail

inserted and tightened.

• Connect Hydraulic rams

• Temporarily install Chute Up Switch to operated the chute

• Apply electrical and air to machine

• Operate the chute, using the maintenance switch to make sure the safety locks properly en-

gage freely

• Use the pendant to lower the chute, CHUTE ENABLE and LOAD, ensure safety locks disen-

gage freely

• Adjust safety locks until chute operates properly

• When properly aligned remove Chute Up Switch and weld in place

• Re-install Chute Up Switch

5.12.1

Chute Up Switch Installation

NOTE: Chute must me in the full up position

Install mounting bracket and adjust switch so that

half the length of the plunger is depressed. Refer to figure 5.10 on page 30.

5.13

Control Function Test

The machine should be cleaned after the installation is complete. A function test should then be
executed on the unloaded machine as follows:

28

Advertising