General specifications, Site requirements, Service clearance – B&C Technologies IS Series Commercial Ironer User Manual

Page 13: 3 site requirements

Advertising
background image

Figure 3.1: IS Series Utility Connection Points

3.2.2

General Specifications and Utility Connection Points

Figure 3.1 on page 10 and Tables 3.2 and 3.1 on pages 12 and 11 describe the necessary utility
connections for the IS Series Ironer.

3.3

Site Requirements

3.3.1

Service Clearance

Figure 3.2 on page 13 shows the recommended minimum service clearances. The dimensions
shown are needed to adequately service and operate the machine with maximum efficiency. Re-

10

Advertising