B&C Technologies IS Series Commercial Ironer User Manual

Page 24

Advertising
background image

Figure 4.1: IS Series - Control Panels

12. For gas units, move the heat switch to the ON position. The heat light turns on. There will

be a delay of 30 seconds prior to ignition.

13. Check that the temperature increases. When the temperature reaches the set point, the heat

light should turn off.

14. Use old or worn linen to perform the initial ironing test.

15. Lay the linen on the feeding belts and allow it to be pulled into the ironer.

16. Adjust the speed control so that the goods come out of the ironer dry and finely pressed.

Refer to Figure 4.1 on page 21.

21

Advertising