Packaging and transport, Batteries and chargers, Battery – Leica Geosystems RCS1100 Series User Manual

Page 13: Packaging, Transport, Packaging and transport batteries and chargers, Batteries and chargers packaging and transport

Advertising
background image

13

RCS1100-1.2.0en

Preparation,Setting up

6

Before packing up the RCS1100 and
the TCPS26 in the bag, unscrew the
antennae and remove the battery
from the RCS1100. For maximum
protection during transport, pack the
units as shown in the diagram.

Your Leica Geosystems instrument is
operated with rechargable plug-in
batteries. The GEB111 is the
preferred battery for use with the
RCS1100, but the GEB121 may also
be used.

Only use batteries, charging
sets and accessories

recommended by Leica
Geosystems.

In order to fully exhaust
battery capacity it is

absolutely necessary with new
batteries to carry out 3 to 5 complete
charging/discharging cycles.

T100Z72

Batteries and chargers

Packaging and transport

1100z06

GEB111

GEB121

After first charging of
batteries you can start

immediately with your job. As a
result, the batteries will be
discharged. Because the operating
time of the battery can be very short
until full capacity is reached it is
recommended to have ready a se-
cond battery and the GKL122 battery
charger. Using the charger, the
battery can be charged/discharged
several times before use.

Advertising