Hardy Floor Scales User Manual

Page 35

Advertising
background image

Hardy Floor Scales

26

cable exit. Locate the conduit to match the
hole location.

Step 1.

Place the pit frame in the approximate
position it will occupy on the floor. (See
Fig. 21)

FIG. 21 FOUNDATION FOR THE PIT FRAME

Step 2.

Mark out the position of the hole to be
made. The hole MUST be a minimum of
12" larger than the pit frame on all sides.
(See Fig. 22)

11” (279.4mm)

3.4375 (87.3mm)

Advertising