Non-c2 loadcell cable connection (j1), 1rq& /rdgfhoo &deoh &rqqhfwlrq, Fig. 3-2 non c2 load cell connection/hi 215it – Hardy WS100 Configuration Software User Manual

Page 14

Advertising
background image

Chapter 3 - Installation

3-3

3

Do not run load cell cable in parallel with or
in the same conduit with power wiring, relay
cables or any other high energy cables.

4

Remove the factory installed jumpers for C2
wire load cell connection.

5

IT summing Card (Prt. #0535-0465)

Non-C2
Loadcell Cable
Connection
(J1)

1

Attach the load cell cable to the terminal
block mounted next to the J1 connector on
the HI 200DNWM Module.

2

Factory installed jumpers to remain in place
for 4 wire load cell connection.

3

Do not run load cell cable in parallel with or
in the same conduit with power wiring, relay
cables or any other high energy cables.

4

Eight (8) conductor load cell cable required
when:

Cable runs are greater than 50 feet.

With Soft Calibration

FIG. 3-2 NON C2 LOAD CELL CONNECTION/HI 215IT JUNCTION BOX