Installation and connections, Check unpacked nvs, About front panel and real panel – IC Realtime 1/2/4 Channel H.264 Network Video Server User Manual

Page 21: Hdd installation, 3 installation and connections, 1 check unpacked nvs, 2 about front panel and real panel, 3 hdd installation

Advertising
background image

15

3 Installation and Connections

Note: All the installation and operations here should conform to your local
electric safety rules.

3.1 Check Unpacked NVS

When you receive the NVS from the forwarding agent, please check whether there is any visible

damage. The protective materials used for the package of the NVS can protect most accidental

clashes during transportation. Then you can open the box to check the accessories.

Please check the items in accordance with the list on the warranty card. Finally you can remove

the protective film of the NVS.

3.2 About Front Panel and Real Panel

For detailed information of the function keys in the front panel and the ports in the rear panel,

please refer to the appendix for detailed information.

The model in the front panel is very important; please check according to your purchase order.

The label in the rear panel is very important too. Usually we need you to represent the serial

number when we provide the service after sales.

3.3 HDD Installation

This series NVS has only one SATA HDD. Please use HDD of 7200rpm or higher.

You can refer to the Appendix for recommended HDD brand.

Please follow the instructions listed below to install hard disk.

1. Loosen the screws of the

upper cover and side panel.

2. Fix four screws in the HDD

(Turn just three rounds).

3. Place the HDD in accordance with

the four holes in the bottom.

4. Turn the device upside down

and then turn the screws in

firmly.

in the chassis.

5.

Fix the HDD firmly.

6. Connect the HDD cable and

power cable.

Advertising