4 monitoring of test resources, 4 basic safety precautions, 2 personnel training – KERN & SOHN EMB 500-1BE User Manual

Page 10: 5 transport and storage, 1 testing upon acceptance, 2 packaging / return transport

Advertising
background image

EMB-V-BA-e-1422

10

3.4 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the
balance and, if applicable, the testing weight, must be checked regularly. The
responsible user must define a suitable interval as well as type and scope of this test.
Information is available on KERN’s home page (

www.kern-sohn.com

with regard to

the monitoring of balance test substances and the test weights required for this. In
KERN's accredited DKD calibration laboratory test weights and balances may be
calibrated (return to the national standard) fast and at moderate cost.

4 Basic Safety Precautions

4.1 Pay attention to the instructions in the Operation Manual

Carefully read this operation manual before setup and
commissioning, even if you are already familiar with KERN
balances.

4.2 Personnel training

The appliance may only be operated and maintained by trained personnel.

5 Transport and storage

5.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.

5.2 Packaging / return transport

 Keep all parts of the original packaging for a possibly

required return.

 Only use original packaging for returning.
 Prior to dispatch disconnect all cables and remove

loose/mobile parts.

 Reattach possibly supplied transport securing devices.
 Secure all parts such as the weighing platform, power unit

etc. against shifting and damage.

Advertising