3 mains connection, 4 battery operation (optional), 5 initial commissioning – KERN & SOHN EMB 500-1BE User Manual

Page 12

Advertising
background image

EMB-V-BA-e-1422

12

6.3 Mains connection

Power is supplied via the external mains adapter. The stated voltage value must be
the same as the local voltage.
Only use original KERN mains adapters. Using other makes requires consent by
KERN.

6.4 Battery operation (optional)

Remove the battery compartment cover on the underside of the scale and connect a
9 V block battery. Replace the battery compartment cover.

For battery operation the balance has an automatic switch-off function which can be
activated or deactivated in the menu (chapter 13).

 In the weighing mode, press

and hold longer until [Pr] is displayed.

 Press

repeatedly until "AF" appears.

 Acknowledge with

.

 Use

now to select between the following two settings:

„AF on“:

In order to save the battery, the balance switches automatically
off after 3 minutes without weighing.

„AF off“:

Switch-off function deactivated.

 Acknowledge selection by

. The balance returns to weighing mode.


If the batteries are run down, "LO" appears in the display. Press ON/OFF-key and
replace the batteries immediately.
If the balance is not used for a longer time, take out the batteries and store them
separately. Leaking battery liquid could damage the balance.

6.5 Initial Commissioning

A warming up time of 2 hours after switching on stabilizes the measuring values.

The accuracy of the balance depends on the local acceleration of gravity.
Strictly observe hints in chapter “Adjustment”.

Advertising