Prepare the ceiling opening and install the lift – Chief Manufacturing Electric Ceiling Lift SL-236 User Manual

Page 8

Advertising
background image

Instruction Manual

SMART-LIFT 236 Electric Ceiling Lifts

7

PREPARE THE CEILING OPENING AND INSTALL THE LIFT

Because of the wide variety of possible mounting situations, Chief Manufacturing can only provide general guidelines
for preparing the location where the Smart-Lift will be installed. Study the following information carefully, and adapt it as
necessary to fit your specific installation.

WARNING: Be especially aware of the weight of the lift, and the potential for personal injury or of damage to
the lift if it is not adequately mounted. The lift (without a projector) weighs approximately 85 lbs (38.5 kg).

The “General Guidelines” below, and the information on the following pages, covers the most common mounting situa-
tions:

Suspend the lift from threaded rods that secure to the structural cross brace.

Side-mount the lift to the ceiling joists or secure the lift to a wood framework mounting to the joists.

General Guidelines

Carefully determine the position of the ceiling opening and its distance from, and orientation toward, the screen.

If possible, prepare an area above the ceiling that is sufficiently larger than the lift, Leaving at least an 8” access to
all sides and above the top of the lift for any future maintenance or repair.

WARNING: Improper installation can result in serious personal injury! To avoid such injury, make sure
that the ceiling structural members can support a redundant weight factor five times
the total weight of the
equipment you intend to support overhead. If they cannot, the ceiling must be reinforced before you
install the lift.

WARNING: Improper installation can result in serious injury! Plenum rated installations require electri-
cally hard wiring the unit through the provided strain relief, the use of Class 2 control wiring, and all open
holes in the housing (except joist tabs) must be sealed using foil tape. You must adhere to all local codes.

CAUTION: For smooth and reliable operation, the lift must be installed square and parallel in all dimensions.
Avoid stressing the lift at any time during installation.

Advertising