Installation – Culligan Gold Series User Manual

Page 13

Advertising
background image

With the exception of media containers, open the remaining containers, remove all the components,

and inspect them before starting installation.

Placement

Refer to figure 1 for system placement.
• Set the media tank on a solid, level surface

near water, drain and electrical facilities.

• Set the brine system on a flat, smooth, solid

surface as near the media tank as possible.

Tank Assembly

Before the unit can be connected to the plumbing the manifold distributors must be assembled and

the underbedding and resin must be loaded into the tank for 12” and 14” tanks.

Position the Mineral Tank(s)

Determine the location for the mineral tanks(s) prior to loading, since they will be difficult to move

after the underbedding and gravel are loaded.

Loading the Tank (12” and 14” Tanks)

1. Position the tank so that the Culligan

®

logo is in the front.

2. Remove the inlet strainer.
3. Install the outlet manifold into the tank (Figure 2).
4. Cover the top of the manifold with a clean rag.
5. Using a large-mouth funnel, load the Culligan underbedding through

the top of the tank.

Installation

13

Caution! Do not lay the tank down unless a suitable lifting device is available. Personal

injury and damage to the unit can result if dropped.

Note: Read this section entirely before starting the installation. Follow all applicable plumbing

and electrical codes.

Figure 1

Drain Line

Hard Water In

Heater

Treated Water Out

To
Hose
Bibs

Water
Meter
or

Pump

Air Gap

Softener

Brine Tank

Caution! DO NOT allow the outlet manifold to move

when loading the media. The manifold must remain vertical

to ensure a good seal at the gasket. Rap the tank near the

bottom with a rubber mallet to level the sand.

Figure 2