Start-up check sheet for 90+ furnace – Sears 9MPD125L20B1 User Manual

Page 2

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

START-UP CHECK SHEET

For 90+ Furnace

(Keep this page for future reference)

Dealer Name:_

Address:_____

City, State(Province), Zip or Postal Code:_

Phone:

Owner Name:.

Address:_____

City, State(Province), Zip or Postal Code:_

Model Number:________________________

Serial Number:_________________________

Type of Gas:

Natural:

LP:

Which blower speed tap is used?

(Heating)__________ (Cooling)___

Temperature of Supply Air:

Temperature of Return Air:

(+)_

(+)_

_or(°C)_

_or(°C)_

Rise (Supply Temp.-Return Temp.): (°F)_____or(°C)_

Fiiter Type and Size:__________________________

Fan "Time ON" Setting:_

Fan "Time OFF" Setting:_

Dealer Comments:

Business Card Here

Manual Gas Shut-Off Upstream

of Furnace/Drip-Leg?

YES

NO

Condensate Drain Connected? YES □ NO □

Condensate Drain Trapped? YES □ NO □

Transition Pressure switch hose relocated for U/D/H

Application? YES □ NO □

Blower Speed Checked? YES □ NO □

All Electrical Connections Tight? YES □ NO □

Gas Valve OK? YES □ NO □

Measured Line Pressure When Firing Unit:____________

Calculated Firing Rate:(See

Checks and Adjustments Sec­

tion).____________________________________________

Temperature Rise (supply-return temperature):(°F)_______

Measured Manifold Gas Pressure:____________________

Static Pressure (Ducts): Supply Air_

Date of Start-Up:________________

CO? _________________________

C 0 2 ? ________________________

Return

H]

440

01 1020 04

Advertising