Assembly step 1, Assemble the rail & install the – Sears 139.53971SRT User Manual

Page 8

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

ASSEMBLY STEP 1

Assemble the Rail & Install the

Th>f/ey

To avoid installation difficulties, do not run the

garage door opener until instructed to do so.

The front rail has a cut out “window" at the door end

(see illustration). The hole above this window Is
larger on the top of the rail than on the bottom. A
smaller hole 3-112" away is close to the rail edge.
Rotate the back rail so it has a similar hole close to
the opposite edge, about 4-314" from the far end. A
3-piece rail uses two back rails.

1. Remove the straight door arm and clevis pin

packaged inside the front rail and set aside for
Installation Step 12.

2. Align the rail sections on a flat surface exactly as

shown and slide the tapered ends into the larger

ones. Tabs along the side will lock into place.

3. Place the motor unit on packing material to protect

the cover, and rest the back end of the rail on top.

For convenience, put a support under the front

end of the rail.

4. As a temporary trolley stop, damp a locking pliers

onto the rail, 8" from the center of the idler pulley
hole, as shown.

5. Check to be sure there are 4 black plastic wear

pads inside the inner trolley. If they became loose
during shipping, check all packing material. Snap
them back into position as shown.

6. Connect the inner and outer trolleys as shown.

7. Slide the trolley assembly along the rail from the

back end to the locked pliers.

Advertising
This manual is related to the following products: