Bonaire Navigator Controller User Manual

Page 38

Advertising
background image

Multi-Appliance Navigator Control


Navigator Control

Page 38

Controls- Installation / Setup / Commissioning

Fan speed settings are correct.

Burner pressure is correct.

Mounting pad/platform complies with requirements / codes.

Internal unit access platforms & service light fitted and complies with codes.

DUAL

CYCLE

REFRIGERATED

AIR

CONDITIONING

UNIT

Unit Foundation correct and Condenser unit is level

Leak test performed

System vacuumed down

Condenser service valves opened.

System is charged with additional charge as required

All clearances around the condenser set to manufacturer’s specifications.

DUCTWORK

All ductwork is completed to plan, correctly supported and airtight, with no bend less than 1.5 x the
ductwork diameter.

Air distribution checked, dampers are adjusted and all outlets correctly adjusted and wiped clean.

All roof penetrations are fully sealed and watertight.

Manhole cover replaced.

SITE

All rubbish has been removed from inside and on the roof.

CUSTOMER

HAND

OVER

The operation of the Controller.

The need to open windows and doors for the correct operation of Ducted Evaporative Air
Conditioning

The operation of the bleed or dumping system and it’s importance to operate all the time in ducted
Evaporative cooling

Maintenance requirements

Advertising