Rt55 t4i operator’s manual – Ditch Witch RT55 User Manual

Page 147

Advertising
background image

Service - 146

RT55 T4i Operator’s Manual

As Needed

8.

Loop cable through links nearest connector pin.

9.

Loosen plug on grease cylinder to relieve chain tension.

10. Stand clear of chain and remove lock key from connector pin. Drive connector pin out of link.

11. Unclamp links. Slowly release cable and lower chain to ground.

12. Lay chain on ground with teeth down.

Fluid pressure could pierce skin and cause injury or death. Stay

away.

NOTICE: Service digging boom grease cylinder only while standing on opposite side of boom.
Wear gloves and safety glasses, and cover fitting with cloth when relieving pressure in cylinder.

Crushing weight could cause death or serious

injury. Use proper procedures and equipment or stay away.

t12om090h.eps

Advertising