Trencher, Rt100 powershift operator’s manual – Ditch Witch RT100 User Manual

Page 141

Advertising
background image

Service - 140

RT100 Powershift Operator’s Manual

As Needed

Trencher

Change Boom Position

1.

Remove digging chain. See “Replace Digging
Chain” on page 141.

2.

Use hoist to move clamp and boom to
centerline (A) or offset (B) position.

3.

Install clamp and boom tube onto pivot arm.

4.

Install digging chain. See “Replace Digging
Chain” on page 141.

5.

Adjust spoils door following procedure on
page 24.

Crushing weight could cause death or serious injury. Use

proper procedures and equipment or stay away.

NOTICE: Use a hoist capable of supporting equipment’s size and weight.

NOTICE: Mount boom tube on sprocket
side of pivot.

Advertising