RT115 Tier 3 - SAW ATTACHMENT

123

OPERATION

RT115 Tier 3 - SAW ATTACHMENT

123

OPERATION

6.

Push ground drive control forward to trenching speed.

7.

When trench is complete, adjust throttle to low idle.

8.

Raise saw and stabilizers.

As saw clears top of trench, move attachment speed/
direction control to neutral.

9.

Swivel seat to the drive position.

10. Tilt steering wheel column down.

11. Drive a short distance away from work site.

12. Disengage axle lock.

Drive tractor in reverse 6’ (2 m) while turning steering wheel
left to right to fully disengage axle lock.

13. Shut down tractor. See TRACTOR for proper shutdown

procedures.

6.

Push ground drive control forward to trenching speed.

7.

When trench is complete, adjust throttle to low idle.

8.

Raise saw and stabilizers.

As saw clears top of trench, move attachment speed/
direction control to neutral.

9.

Swivel seat to the drive position.

10. Tilt steering wheel column down.

11. Drive a short distance away from work site.

12. Disengage axle lock.

Drive tractor in reverse 6’ (2 m) while turning steering wheel
left to right to fully disengage axle lock.

13. Shut down tractor. See TRACTOR for proper shutdown

procedures.