Backfilling

1.

Position unit at end of trench, several feet from spoils. Aim
tractor at outer edge of spoils.

2.

Adjust backfill blade to fit land contour.

3.

Move outer edge of spoils toward trench. Take two or more
passes at spoils rather than moving all spoils at once.

4.

Repeat on other side of trench, if necessary.

5.

Engage float and make final pass over trench.

EMERGENCY SHUTDOWN - Turn ignition switch to STOP.

Backfilling

1.

Position unit at end of trench, several feet from spoils. Aim
tractor at outer edge of spoils.

2.

Adjust backfill blade to fit land contour.

3.

Move outer edge of spoils toward trench. Take two or more
passes at spoils rather than moving all spoils at once.

4.

Repeat on other side of trench, if necessary.

5.

Engage float and make final pass over trench.

EMERGENCY SHUTDOWN - Turn ignition switch to STOP.