Operation – Ditch Witch RT115 User Manual
Page 138
RT115 Tier 3- BACKHOE ATTACHMENT
OPERATION
138
RT115 Tier 3 - BACKHOE ATTACHMENT
OPERATION
OPERATION
1.
Use boom/swing control and bucket/dipper control to dig hole
or trench.
•
Keep dipper and
boom at right
angles as much
as possible for
maximum power.
•
Keep bucket in
line with dipper as
much as
possible.
•
Position bucket
so teeth cut soil.
As soil is cut, curl
bucket under
dipper.
•
Move dipper and
bucket together.
Increasing
engine speed will
not increase
backhoe force.
om1761
om1762
OPERATION
1.
Use boom/swing control and bucket/dipper control to dig hole
or trench.
•
Keep dipper and
boom at right
angles as much
as possible for
maximum power.
•
Keep bucket in
line with dipper as
much as
possible.
•
Position bucket
so teeth cut soil.
As soil is cut, curl
bucket under
dipper.
•
Move dipper and
bucket together.
Increasing
engine speed will
not increase
backhoe force.
om1761
om1762