RT115 Tier 3 - DRILLING ATTACHMENT

143

PREPARE JOBSITE AND EQUIPMENT

RT115 Tier 3 - DRILLING ATTACHMENT

143

PREPARE JOBSITE AND EQUIPMENT

PREPARE JOBSITE AND EQUIPMENT

Approach Trench (1)

1.

Mark path where you intend to drill.

2.

Dig an approach trench (1) along the intended bore path.

Target Trench (2)

1.

Select a completion point for the drilling project.

2.

Dig a target trench (2) across the anticipated completion
point.

IMPORTANT: The approach trench should be at least:

deep enough for pipe to lay flat and enter soil
at correct angle

20’ (6 m) long

4" (100 mm) wide

IMPORTANT: The actual length of the target trench
depends on soil conditions and length of pipe sections.
Make it deep enough for drill bit to enter slightly above
the trench floor.

om0529h eps

1

2

PREPARE JOBSITE AND EQUIPMENT

Approach Trench (1)

1.

Mark path where you intend to drill.

2.

Dig an approach trench (1) along the intended bore path.

Target Trench (2)

1.

Select a completion point for the drilling project.

2.

Dig a target trench (2) across the anticipated completion
point.

IMPORTANT: The approach trench should be at least:

deep enough for pipe to lay flat and enter soil
at correct angle

20’ (6 m) long

4" (100 mm) wide

IMPORTANT: The actual length of the target trench
depends on soil conditions and length of pipe sections.
Make it deep enough for drill bit to enter slightly above
the trench floor.

om0529h eps