Ditch Witch RT115 User Manual

Page 207

Advertising
background image

RT115 Tier 3 - SERVICE

207

AS NEEDED

RT115 Tier 3 - SERVICE

207

AS NEEDED

15. Tighten chain by pumping EPG into grease cylinder.

Time Augers

Ensure that augers are balanced, as shown. If auger timing is off,
unit will bounce from side to side even in normal digging
conditions.

To adjust timing:

Remove bolts holding augers to auger shaft and rotate either
auger as needed until augers are balanced.

Reinstall bolts and tighten securely.

g6jmg01h.tif

15. Tighten chain by pumping EPG into grease cylinder.

Time Augers

Ensure that augers are balanced, as shown. If auger timing is off,
unit will bounce from side to side even in normal digging
conditions.

To adjust timing:

Remove bolts holding augers to auger shaft and rotate either
auger as needed until augers are balanced.

Reinstall bolts and tighten securely.

g6jmg01h.tif

Advertising