Trencher, Plow – Ditch Witch RT115 Q User Manual

Page 143

Advertising
background image

Service - 142

RT115Q Operator’s Manual

50 Hour

Trencher

Check Trencher Gearbox Oil

Check oil at sight tube every 50 hours. Keep oil
level at horizontal line on housing. If necessary,
add MPL at fill plug.

Plow

Change Plow Vibrator Oil

Change plow vibrator oil after first 50 hours of
operation. Drain oil at drain plug (2). Replace
plug and move plow vibrator to horizontal
position. Add MPL at fill (1) until oil is halfway up
sight glass (2). Refill capacity is 4 qt (3.8 L).

Hot parts may

cause burns. Do not touch until
cool.

Advertising