Rt115q operator’s manual – Ditch Witch RT115 Q User Manual

Page 161

Advertising
background image

Service - 160

RT115Q Operator’s Manual

As Needed

8.

Loop cable through links nearest connector
pin.

9.

Loosen plug on grease cylinder to relieve chain tension.

10. Stand clear of chain and remove lock key from connector pin. Drive connector pin out of link.

11. Unclamp links. Slowly release cable and lower chain to ground.

12. Lay chain on ground with teeth down.

Fluid pressure could pierce skin and cause injury or death. Stay

away.

To help avoid injury: Service digging boom grease cylinder only while standing on opposite
side of boom. Wear gloves and safety glasses, and cover fitting with cloth when relieving
pressure in cylinder.

Crushing weight could cause death or serious

injury. Use proper procedures and equipment or stay away.

Advertising