Position tractor, Attach product, Rt115q operator’s manual – Ditch Witch RT115 Q User Manual

Page 92

Advertising
background image

RT115Q Operator’s Manual

Plow - 91

Setup

CMW

Position Tractor

1.

Fasten and adjust seat belt.

2.

Start tractor. See page 64 for start-up procedures.

3.

Drive to starting point. Move in line with planned trench.

4.

Engage parking brake and verify parking brake indicator is on.

5.

Lower backfill blade, if equipped.

6.

Set Trench / Plow switch to the plow position.

7.

Lower plow to starting point of trench.

8.

Turn ignition switch to STOP.

Attach Product

To Pull Product

1.

Insert material into pulling grip.

2.

Tape grip with duct tape.

IMPORTANT: If material must be at a constant depth, dig starting and target trenches.

Advertising