Dunkirk DWB Series User Manual

Page 24

Advertising
background image

WARNING

Asphyxiation hazard. Carbon monoxide is odorless,

tasteless, clear colorless gas, which is highly toxic.

Carbon monoxide production shall not exceed

400ppm. Failure to follow these instructions could

result in death or serious injury.

WARNING

Asphyxiation hazard. Verify cap is fi rmly placed on

combustion analyzer port to prevent CO emission.

Failure to do so could result in death or serious

injury.

9.3 Burner Pressure Adjustment

Unit has fl ame modulation, with two fi xed pressure values:

minimum and maximum. See Sec. 12, page 34.

Connect pressure gauge to pressure point “B” downstream

of the gas valve.

1.

Remove protection cap “D”.

2.

Operate boiler in TEST mode.

3.

Adjust maximum pressure by turning screw “G”

clockwise

to increase pressure and counter clockwise

to decrease.

4.

Disconnect one of two connectors “C” from modulation

regulator “F” on the gas valve.

5.

Adjust minimum pressure by turning screw “E” clockwise

to increase the pressure and counter clockwise

to

decrease it.

6.

Turn burner on and off, verify minimum pressure

remains stable.

7.

Reconnect connector “C” detached from modulation

regulator “F” on the gas valve.

8.

Verify maximum pressure has not changed.

9.

Replace protection cap “D”.

10.

To end TEST mode, repeat activation sequence or wait

15 minutes.

9.4 To Enter Test Mode/Adjust Heating Power

Press CH+/- buttons at the same time for 5 seconds.

• 3 way valve is in CH position and burner is forced at

100%. Boiler automatically exits test mode after 15

minutes or to exit test mode manually press CH +/-

buttons together for 5 seconds.

• With Ch +/- buttons you can adjust Max power from (0

to 100%)

9.5 Ignition Adjustment

To adjust ignition, switch boiler to TEST mode (See Start

up Procedure). Press DHW buttons to increase or decrease

power (min.= 00, max. = 60). Press RESET button within

5 seconds and ignition remains set. Exit TEST mode.

24

9 - START UP PROCEDURE

9.1 Fill Boiler With Water And Purge Air

NOTICE

To maintain boiler effi ciency and prevent boiling

inside the heat exchanger, fl ush entire heating

system until clean.

• Flush heating system, including all heating zones.
• Fill boiler with potable water.
• Fill boiler and system piping with water (or

antifreeze-water solution, if used). See antifreeze

information Section 5.3 page 11. Purge air from

boiler using air vent. Purge air from system piping.

• Inspect system piping and boiler connections.

Repair any leaks immediately.

• Activate all heating zones and calls for heat,

including CH calls and DHW calls (if available).

• Close manual gas shut off valve. Let system run for

30 minutes. When boiler goes into lockout, reset

boiler by pressing “Reset” button until boiler resets.

• Do not open gas shutoff valve until all air is purged

from system.

9.2 Boiler Start-up and Operational Test

1.

Verify air is purged from hydronic piping

2.

System test pumps - verify each pump is

operational

3.

Verify gas piping

• Confi rm pressure test. See section 7.3 page 20.
• Visually inspect piping to determine there are no

open fi ttings or ends, and all valves at unused

outlets are closed and plugged/capped.

• Purge air from piping
• Check piping and connections for leaks immediately

after gas is turned on. Shut off gas supply and

make necessary repairs if leaks found.

4.

Follow OPERATING INSTRUCTIONS to initiate boiler

operation. See section 10.

5.

Inspect combustion air and vent piping. Verify pipe

is not leaking and terminations are unobstructed and

vent gas discharge is not a nuisance or hazard.

6.

Verify boiler operates.

7.

Check control module operation.

8.

Check fi eld sourced limits, low water cutoffs, etc. per
manufacturer's instructions.