Installation – Echelon Lumewave CPD 3000 Lighting Controller User Manual

Page 6

Advertising
background image

6

Installation

Installation for the CPD 3000 OLC uses the following steps. It is important to

disconnect line voltage before installing or replacing a CPD 3000 module.

1. Install the CPD 3000 OLC module.
2. Connect the AC mains power to the module.
3. Connect the filtered power output of the CPD 3000 OLC module to the

luminaire power supply (electronic ballast/generator, ballast, or driver).

4. Connect the CPD 3000 control signal wires to the luminaire control input.


Figure 1. CPD 3000 Installed in the Light Fixture




Advertising