Harmonic Resolution Systems MXR Audio Stand User Manual

Page 13

Advertising
background image

Photo 23 Photo 24

Once all the feet are installed, you can now stand the frame up on the four feet.
You will want to have two or more people carefully lift the frame and clear any
objects so you do not damage the panel finish.

Isolation Base Bracket Installation - Each of the isolation bases has four feet on
the bottom that supports the shelf. Each of these feet sits in the pocket of a bracket
screwed to the MXR panel. There are two brackets on the first panel and two
brackets on the second panel (four total) for each isolation base. The MXR is
designed so that one isolation base sits at the very top location (see Photo 26) and
one isolation base sits at the very bottom of the frame (see Photo 25). When the
brackets are in these locations, the isolation bases will automatically be located
just above the top brace and bottom brace. The other brackets can be located as
needed depending on location for component size. Make sure that all four
brackets for each isolation base are in the same location (plane) on the frame.
There are four 1/4-20 x 5/8" screws used to attach each bracket to the aluminum
panel in the frame (see Photo 26). Locate each bracket on the frame and install the
four screws. You should fully engage each screw prior to applying final torque.
The T-wrench (see Photo 26) should be used to install the screws. You will find
that the handle length clears the end of the bracket for easy installation.

Photo 25 Bottom Bracket Orientation Photo 26 Top Bracket Orientation

Advertising