Harmonic Resolution Systems MXR Audio Stand User Manual

Page 15

Advertising
background image

Photo 27

Isolation Base Installation into MXR Frame - Uncrate each of the isolation
bases if not already complete. Make sure you read and follow all of the
instructions in the isolation base manual prior to installing into the MXR Audio
Stand frame. You will want to verify that the frame size matches the isolation base
size. The MXR-1921 uses the 1921 isolation bases. The MXR-1719 uses the 1719
isolation bases.

Match the load range of each isolation base with the component weight. Matching
the isolation base to the proper component weight will insure optimum
performance. The load range can be changed for a nominal factory fee so if you
do not have the correct load range for a component, please contact Harmonic
Resolution Systems or your local certified retail location to arrange to have this
corrected.

Load the Isolation Bases into the brackets (see Photo 28), with the HRS logo facing
the front of the rack system. Be sure that the isolation base (shelf) foot is located
securely in the pocket of the isolation base bracket. This will automatically occur
when the front and back edge of the isolation base is in line with the front and back
face of the two vertical panels. If the front and back edges do not line up with the
front and back of the rack structure then, contact Harmonic Resolution Systems or
your certified retail location because you do not have the proper size isolation base
or frame. Measure the height of each component and see if the selves are in the
proper location. If needed, you can move the isolation base (shelf) up or down by
removing the shelf and adjusting the location of the four brackets for that isolation
base. Always follow the instructions above for bracket installation when moving
brackets. Be very careful not to cross-thread the fasteners. The fastener should
thread in very easily. If it does not, back it out and start it in again (repeat as
necessary). If necessary, back out the other three nuts and move the bracket until
they all thread in with minimal torque. Apply proper torque once they are all fully
threaded into the rack frame.

Advertising