Lingenfelter L250280197 Lingenfelter C5 Corvette E-Force Supercharger Install Kit v2.9 User Manual

Page 52

Advertising
background image

Page 51

166. Determine whether the black ground wire

needs lengthened to reach the factory ground

stud (pictured in the next step). If necessary,

lengthen the black ground wire. Next, slide a

piece of heat shrink tubing over the black ground

wire. Then, crimp the insulated eye connector

to the black ground wire. Finally, slide the

heat shink tubing over the crimped joint and

heat to seal the joint.

ALTERNATIVE METHOD: After lengthening

black ground wire, connect an insulated and

sealed eye connector (PN: 23831 or equivalent-

not included in the kit) to the black ground wire.

167. Route the ground wire around the battery

tray and fasten to the factory ground stud with the

10mm factory ground nut. The ground is located

below and slightly to the side of the positive

battery cable.

168. Route the pressure switch harness around

the battery tray and along the back of the engine

towards the driver-side. Let the harness hang

temporarily.

169. Locate the connector with the light green

identification tape on it. This is where the Boost-

A-Pump wires will be spliced into.

Advertising