14

INSTALLATION

Model SCS-130 Transformer Card

Description

The SCS-130 provides power to the SCS-110 Modem Power Supply Card and the SCS-120 Multibus Power Supply

Card. Two terminals are provided for connecting 120 VAC to the system. A power cord is provided for connecting

the multibus rack cooling fan.

3 Amp 250V

To fan

COM

J3

J2

HOT

AC Power Cord

Installation

Always remove power to the SCS-1R Receiver when installing or removing the SCS-130.

1. Install the SCS-130 with J2 on the right side on the rear of the modem rack and J3 on the bottom

as shown above. Four 6-32 screws with lock washers are provided.

2. Connect the SCS-208 Power Cable to J3 on the bottom left of the SCS-130 Transformer Card.

Connect the other end of the power cable to the SCS-120 Multibus Power Supply. The power cable

can be used in either direction.

3. Connect the cable from the right end of the modem rack labeled J2 to J2 on the right side of the

SCS-130 Transformer Card.

4. Connect the 2-conductor cables labeled TO FAN to the multibus cooling fan on the lower right side

of multibus rack.

AC Power Connection

Connect 120 VAC to the SCS-1R Receiver through the SCS-130 Transformer Card. The SCS-1R Receiver backplate

provides a 7/8” conduit knockout.

1. Install the supplied strain relief onto the AC power cord approximately 12 inches from the AC wires.
2. Feed the end of the AC power cord through the backplate knockout until the strain relief snaps into place.
3. Connect the White AC power cord wire to the COM terminal on the bottom of the SCS-130.
4. Connect the Black AC power cord wire to the HOT terminal on the bottom of the SCS-130.
5. Connect the Green AC power cord ground wire to the grounding lug located on the right side of the

enclosure.

The AC power must be provided by a listed UPS. A signal shall be provided at the operators console when the UPS

power source switches from primary power to secondary power.
DO NOT APPLY POWER TO THE RECEIVER UNTIL THE REAR COVER IS REPLACED ON THE RECEIVER CABINET.

Three Amp Fuse

The 120 VAC connection to the SCS-1R Receiver is current limited with a DMP Model 319, 3 Amp 250 volt fuse. The

3 Amp fuse is a Type AGC 1/4” x 1 1/4” fast blow.