Deleting maximum demand, Maximum demand integration period – CIRCUTOR CVM-C10 Series User Manual

Page 41

Advertising
background image

Single-phase network measurement, phase to neutral, with a 2-wire connection.

To validate the data, press

for 3 seconds and the

prog icon will disappear from the display.

Press key

to access the next programming step.

4�9�9� Maximum demand integration period

The maximum demand integration period is programmed in

minutes on this screen.
Press key

for 3 seconds to edit the integration period value.

The

prog icon will be displayed on the bottom of the screen.

To enter or modify the value, press the

key repeatedly,

increasing the value of the flashing digit.

When the desired value is shown on the screen, move onto the next digit by pressing the key

to modify the other values.

If you press the

key after changing the last digit, it will jump back to the first digit so you

can modify the previously programmed values again.

To validate the data, press

for 3 seconds and the

prog icon will disappear from the display.

The programmed value will be deleted if the entered value is higher than the maximum

programming value.

Maximum programming value: 60.

Minimum programming value: 1.

Press key

to access the next programming step.

4�9�10� Deleting maximum demand

On this screen you select whether or not to delete the maximum

demand.
Press key

for 3 seconds to edit the deletion selection. The

prog icon will be displayed on the bottom of the screen.

Press key

to browse the two deletion options: Yes or No.

To validate the data, press

for 3 seconds and the

prog icon will disappear from the display.

Press key

to access the next programming step