Rigging, 7 consequent arrays – Adamson E-Series User Manual

Page 31

Advertising
background image

Page 31

3.7 Consequent Arrays

Attaching the second and consequent arrays

1. Lift Frame with the attached 4 enclosures high enough to clear the

next 4 -stack underneath. (they should all have their angles set)

2. Place rear rigging (red levers on box #4, 8, 12, 16...28) to ‘Spring’

mode, make sure the same cabinets’ front rigging bars are released

using black levers. (Fig. 1)

3. Place front rigging’s blue levers (box #5, 9, 13, 17...29)... (first box in

the new 4-stack to be suspended) to ‘Spring’ mode (Fig. 2)

4. Pull front rigging’s black lever (box #4,8,12,16...28) allowing the

rigging piece to drop. (Fig. 3)

Fig. 1

Fig. 2

Fig. 3

Rigging

E-Series | Rigging

PINCH POINT

CAN CAUSE SEVERE

PERSONAL INJURY

WARNING

SAFETY RISK

PAY SPECIAL ATTENTION

Advertising