Installation, Steps for finalizing the installation, For qualified installers only) – Avalon Firestyles 564 HO GS2 Installation User Manual

Page 40

Advertising
background image

40

Installation

(

for qualified installers only)

40

Travis Industries

4150330

100-01408

Steps for Finalizing the Installation

1. Remove the glass.

NOTE: If using propane (LP) convert the appliance prior to installing the logs.

2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be detected

once it enters the firebox, ensuring gas does not build up.

3. Make sure the accent light bulbs are in place.

NOTE: Take care to not touch the bulbs with your fingers (use a cloth or paper towel).

4. Install the four AA batteries (see illustration below). The AA batteries act as a power backup in case the

household (AC) power goes out and are required for operation. Install three AAA batteries into the remote (see
illustration below). Synchronize the transmitter to the IFC.

5. Install the burner and media (and firebacks if applicable).
6. Replace the glass.
7. Start the heater.
8. Leak test all gas joints.

AAA Battery

AAA Battery

°F

AAA Battery

AA Battery

AA Battery

AA Battery

AA Battery

Advertising