Table 2-2. Circuit Board Controls

Locator

Description

A

Target Operating Current Jumpers. Two user-adjustable jumpers control the range of trip

circuit current required to operate the time overcurrent (51) and instantaneous overcurrent

A (50-A) target indicators. Jumper J1 sets the minimum current range for the 50-A target

indicator and J2 sets the minimum current range for the 51 target indicator. Two jumper

positions are possible: across pins 1 and 2 or across pins 2 and 3. When the jumper is

installed across pins 1 & 2, the targets must operate ≥ 2.25 A and must not operate < 900

mA. When the jumper is installed across pins 2 & 3, the targets must operate ≥ 200 mA and

must not

B

operate < 80 mA.

Four Position Slide Switch. This switch assembly, designated SW3, has four independent

slide switches designated SW3-1, SW3-2, SW3-3, and SW3-4. Each switch functions as

follows:
SW3-1 selects the nominal system frequency. The OFF position selects 60 Hz operation

and the ON position selects 50 Hz operation.
SW3-2 provides an additional time delay for the instantaneous overcurrent A (50-A)

element. The ON position provides an additional delay of 100 milliseconds.
SW3-3 selects either GE IAC or Westinghouse CO type characteristic curves. The ON

position selects the GE IAC type curves (listed in Table A-1) and the OFF position selects

the Westinghouse CO type curves (listed in Table A-2).
SW3-4 selects either an instantaneous or integrating time reset characteristic. The ON

position selects an integrating reset characteristic and the OFF position selects an

instantaneous reset characteristic.

C

Instantaneous Overcurrent B Pickup Selector Switches. These two screwdriver-adjusted,

rotary switches select the instantaneous overcurrent B (50-B) pickup current setting in

amperes.
The 50-B pickup switches are accessed on the top side of the draw-out assembly by

removing the draw-out assembly from the case.
The left-hand switch (SW9) is a 16-position switch that sets the units portion (#.#) of the 50-

B pickup setting in amperes. SW9 setting positions consist of 0 through 9 which correspond

to values of 0 to 9 amperes and A through F which correspond to values of 10 to 15

amperes. The right-hand switch (SW10) is a 10-position switch that sets the tenths portion

(#.#) of the 50-B pickup setting in amperes. SW10 setting positions consist of 0 through 9

which correspond to values of 0.0 to 0.9 amperes.
The minimum allowable 50-B pickup setting is 1.0 Aac and the maximum allowable 50-B

pickup setting is 15.9 Aac. Adjusting the 50-B pickup selector switches while the relay is in

service may cause the relay to trip.
Example: SW9 position 2 and SW10 position 5 is a setting of 2.5 Aac.