Indirect Gas-Fired Heat Modules

12

®

Install Combustion Air Pipe

Run a combustion air pipe from the unit’s combustion
air intake through the exterior wall to the outdoors. The
combustion air pipe must terminate at least 12 inches
from the combustion vent pipe and 24 inches from
the exterior surface of the outside wall. Attach the
combustion air inlet guard to the end of the combustion
air pipe. Using field-supplied mounting brackets,
support the combustion air pipe as needed.

Seal Wall Openings

Using an appropriate method, seal the wall openings
around the piping.

Vent Connection Diameter

Vent terminals must
be used. Construct
the vent system as
shown in the drawings
and refer to the table
for the correct vent connection diameters.

Furnace Size

(MBH)

Exhaust

(inches)

Combustion

(inches)

75-175

4

4

200-400

6

6

Vent Length

Refer to table for minimum and maximum vent lengths.
The minimum vent
length is 10 feet and
the maximum vent
length is 70 feet. The
total equivalent vent length must include elbows. The
equivalent length of a 4 inch elbow is 6 feet and the
equivalent length of a 6 inch elbow is 10 feet.

Install Exhaust Pipe

Run an exhaust pipe from the unit’s combustion exhaust
through the roof to the outdoors. The exhaust pipe must
terminate at least 24 inches above the outside surface
of the roof. This clearance may need to be increased to
accommodate snow accumulation. Attach the exhaust
vent terminal to the end of the exhaust pipe.

Install Combustion Air Pipe

Run a combustion air pipe from the unit’s combustion
air intake through the roof to the outdoors. The
combustion air pipe must terminate at least 12 inches
horizontally and vertically from the combustion exhaust
pipe and at least 24 inches from the exterior surface of
the roof. These clearances may need to be increased
to accommodate for expected snow accumulation.
Attach the combustion air terminal to the end of the
combustion air pipe.

Seal Roof Penetration

Using an appropriate method, seal the roof openings
around the vent pipes.

Vent

Length

Minimum

(feet)

Maximum

(feet)

Vertical

10

70

A = 12 inch minimum, but should size

according to expected snow depth

B = 24 inch minimum

C = 12 inch minimum

D = 12 inch minimum

Tee with

drip leg and

clean-out cap

D

D

EXHAUST

Exhaust Vent

Terminal

COMBUSTION AIR

Combustion

Air Inlet

Terminal

Roof Line

B

A

C

Installation of Two Pipe Venting –
Vertical

Refer to the diagram for venting vertical concentric
systems. The combustion air pipe must terminate at
least 12 inches above the roof. This clearance may
need to be increased to accommodate for snow
accumulation. The exhaust must terminate at least
12 inches above and 12 inches horizontally from the
combustion air inlet.