Ravenheat CSI 85 User Manual

Page 51

Advertising
background image

51

The code of practice for the installation, commissioning & servicing of gas central heating

Installation, Commissioning and Service Record Log Book

NAME

ADDRESS

TEL No.

CUSTOMER DETAILS

IMPORTANT

COMPANY NAME

INSTALLATION DATE

ADDRESS

TEL No.

INSTALLER’S NAME

CORGI REGISTRATION DETAILS REG No.

CORGI ID SERIAL No.

INSTALLER & COMMISSIONING ENGINEER DETAILS

NAME

COMMISSIONING DATE

ADDRESS

TEL No.

CORGI REGISTRATION DETAILS REG No.

COMMISSIONING ENGINEER

(IF DIFFERENT)

CORGI ID SERIAL No.

LOCATION

%

MAKE AND MODEL

APPLIANCE SERIAL No.

SEDBUK No. %

LOCATION

BOILER

NEW SISTEM

or REPLACEMENT BOILER

For the central heating mode, measure and record:

HEAT INPUT

kW

BURNER OPERATING PRESSURE

mbar

CENTRAL HEATING FLOW TEMPERATURE

°C

CENTRAL HEATING RETURN TEMPERATURE

°C

HAS A WATER SCALE REDUCER BEEN FITTED?

YES NO

WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?

FOR COMBINATION BOILERS ONLY

HAS THE SYSTEM BEEN FLUSHED IN ACCORDANCE
WITH THE BOILER MANUFACTURER’S INSTRUCTIONS?

WHAT WAS THE CLEANSER USED?

HAS AN INHIBITOR BEEN USED?

WHICH INHIBITOR WAS USED?

FOR ALL BOILERS

YES

NO

YES

NO

CONTROLS

To comply with the Building Regulations, each section must have a tick in one or other of the boxes.

REQUIREMENT

MEASURES PROVIDED

1. TIME AND TEMPERATURE CONTROL TO HEATING

ROOM STAT & PROGRAMMER/TIMER

PROGRAMMABLE ROOMSTAT

2. TIME AND TEMPERATURE CONTROL TO HOT WATER CYLINDER STAT & PROGRAMMER/TIMER

COMBI BOILER

3. HEATING ZONE VALVES

FITTED

NOT REQUIRED

4. THERMOSTATIC RADIATOR VALVES

FITTED

5. AUTOMATIC BYPASS TO SYSTEM

FITTED

NOT REQUIRED

6. BOILER INTERLOCK

PROVIDED

PLEASE FOLLOW THE INSTALLATION AND COMMISSIONING INSTRUCTIONS IN THE INSTALLATION MANUAL SUPPLIED WITH THE EQUIPMENT

The content of this Log Book has been produced in

consultation with

©

CENTRAL HEATING INFORMATION COUNCIL

INSTALLER DETAILS

1. Please keep the Log Book in a safe place for future reference.

2. This Log Book is to be completed in full by the competent person(s) who commissioned the boiler and associated equipment and then handed to

the customer. When this is done, the Log Book is a commissioning certifi cate that can be accepted as evidence of compliance with the appropriate

Building Regulations.

3. Failure to install and commission this appliance to the manufacturer’s instructions may invalidate the warranty.The above does not affect your statutory rights.

Benchmark is supported by

Advertising