4 design and planning, 1 general information, Design and planning 4.1 general information – REMKO EFS 35 User Manual

Page 11: Design and planning, Ab c, General information

Advertising
background image

4

Design and planning

4.1

General Information

The fresh water station is a fresh water module

that heats domestic water according to the contin-

uous flow heater principle. In order to ensure fault-

free operation of the fresh water station, the

system must fulfil certain prerequisites. Before

installation, take some time for planning.

CAUTION!

Danger of scalding due to hot water!
Due to external circulation in the primary cir-

cuit, water with a temperature of up to 90 °C

can leak out at the dispensing connection.

No external pumps are permitted to be

installed between the fresh water module

and the buffer tank.

The fresh water module is not permitted to

be connected to a heating cycle distributor.

Installation example

The operating mode can be bivalent alternative.

This hydraulic diagram serves merely to assist in planning activities;

the hydraulic system on site must be planned and laid out by the installer!

Subject to technical changes!

MPS 800

oder/or

MPS 1000

A

B

C

FB

KW

WW

D

E

Fig. 3: Fresh water station with optional circulation set and optional return distribution

(Schematic with missing hydraulic components!)

A:

Outdoor module

B:

Indoor module

C:

Storage tank

D:

Circulation

E:

Fresh water station EFS 35

FB:

Floor heating cycle

KW:

Cold water

WW:

Hot water

11

Advertising