6 commissioning report, 8 maintenance, Maintenance – REMKO EFS 35 User Manual

Page 21: Commissioning report

Advertising
background image

7.6

Commissioning report

System operator

System location

Serial numbers

REMKO EFS25

- Medium flow rate probes

- Controller

- Software version

Primary piping

Ø =

mm

l =

m

Secondary piping

Ø =

mm

l =

m

Other installations

q Circulation set

q Return distribution set

q Miscellaneous:

Are both circuits cleaned and bled properly? (no air noises in the pump)

q

Bled

Are all shut-off valves in the cold water supply opened?

q

Opened

Is pressure of at least 1.5 bar present on the primary side?

q

Checked

Is pressure of at least 2.5 bar present on the secondary side?

q

Checked

Is an error message shown on the display?

q

No message

Installation operation

Date, Signature

8

Maintenance

After each retroactive structural modification to the

primary side (e.g. installing a dirt separator, a dirt

trap or a mixing valve), you must start a new com-

missioning procedure in the controller to ensure

optimum regulation.

You should also carry out commissioning again

after adjusting the mixing valve temperature.

A specialist must check that the safety valve is

functioning correctly when commissioning and at

least once per year.