J15 j14 – Verilink AS2000: The Basics (880-502981-001) Product Manual User Manual

Page 61

Advertising
background image

Hardware Installation

Verilink Access System 2000: The Basics

4-15

6. Measure the +5 VDC output on the front panel of the power

supply between the test points labeled, +5V and +5 RTN
(return). The reading should be +5.5V with a variance of
±0.055V. If the reading exceeds this variation in tolerance,
replace the power supply.

7. Unplug Power Supply A from the shelf, and repeat steps 1

through 4 above for Power Supply B. Install this power supply
into the second power unit slot next to Power Supply A.

Figure 4-14 Multi-line Ground and Voltage Measurements

8. Re-insert Power Supply A into the shelf.

9. Repeat Steps 1 through 6 for the remaining Multi-line shelves

in each node.

WARNING

To prevent possible arcing damage, re-install the protective cover box

over terminal strip TB1 before applying power.

Applying AC Power

to 115 VAC Power

Supplies (PAC

2910)

To apply power to the Multi-line shelf, do the following:

1. Plug one of the 115 VAC power supplies into the associated AC

outlet.

2. Verify that the Power LED is green on the power supply front

panel. If the LED is not lit, verify the voltage at the AC power
outlet.

-48 RTN A

NO_A

NC_A

GND

-12A

GND

GND

CGND

12 RTN

+5 A

-48 RTN B

-48 VB

NO_B

NC_B

GND

-12 B

GND

GND

C_B

CGND

12 RTN

+5 B

+5 B

J15

J14

-48 VA

C_A

+5 A

Pin 26

Pin 24

Pin 28

Pin 30

Pin 32

Pin 26

Pin 24

Pin 28

Pin 30

Pin 32

Advertising