Grass Valley Aurora Ingest v.6.5.2 User Manual

Page 135

Advertising
background image

Synchronizing Events between Scheduler and ScheduALL

Events on both applications need to be synchronized especially when Ingest Server
or ScheduALL is suddenly closed and needs to be restarted.

To synchronize events:

1. Select

Tools | Options | System

within Aurora Ingest Server.

2. Click the

Configure

button, beside the ScheduAll Server setting to launch the

ScheduAll Properties window.

3. Then, click the

Synchronize Events

button to launch the Synchronize with ScheduAll

window.

13 August2009

Aurora Ingest System Guide

135

Using Aurora Ingest - Scheduler

Advertising
This manual is related to the following products: