Hand over – Ion Science Hydrosteel 7000 User Manual

Page 31

Advertising
background image

Hydrosteel 7000 MANUAL

Ion Science Ltd

Page 31 of 43

Unrivalled Detection. www.ionscience.com

Commissioning


Hand over
1. With the permission of the owner, photograph the unit as installed. The photographs will provide a

documentary record of sound installation. Photographs should show the following.

Correct probe installation

Probe is securely mounted and safe from foreseeable damage

Sample conduit has been mounted securely and is safe from foreseeable damage

HY7K is mounted securely and is safe from foreseeable damage

All connections have been made securely to the HY7K and are safe from foreseeable damage


2. Produce hand-over document with the following details:

Customer details

Customers PO no

Hand-over date

Site or location reference

Equipment tag number or other reference

Add the photographs

Operation test results

First flux and pipe temperature measurements


3. Have the installation inspected and the hand-over the signed document.
































Advertising